Construction of 1 pillar at carporch step by step: 1.

Job details

Location

Kajang, Selangor

What service do you need?

Install / Mounting, Others (Please explain details further below)

What do you want the handyman to work on?

Walls, Others (Please explain details further below)

Which room(s)?

Outdoor, Others (Explain in Notes below)

Do you already have the materials or parts?

No, the Pro has to provide the parts / item

Type of property

Landed (e.g terrace, semi-d, bungalow)

Preferred Appointment Date

28/09/2026

Preferred Appointment Time

09:00 - 11:00

Explain more details or requirements (Optional)

Construction of 1 pillar at carporch step by step: 1. Build concrete wall (depth=47cm, width=20cm, height=194cm), measured from left pillar must be slightly less than 16ft, about (485cm). 2. Once concrete wall is dry, build new pillar by using my red bricks to join with concrete wall to form a single pillar. (entire new middle pillar size after plastering (depth=47cm, width=68cm, height=194cm) 3. Capping for pillar top is no longer needed, just install provided mailbox and plaster the top. 4. For concrete foundation drilling, drill 20cm deep into the ground with 8 steel rods, refer to picture below. Material / hardware: As per agreement with the contractor, all hardware on the list shown in the invoice will be provided by contractor. I will provide epoxy, 3 bags of cement, mailbox, red bricks. Appoinment: Contractor has visited and assessed my site few days ago and ready to begin the work next monday morning or Tuesday morning if rains on Monday morning.

Rough Budget

RM500 - 1999