1. Open
  2. Assigned
  3. Completed

Project Location: The Serenade, The Glades, Putra Heights…

Job details

Location

Putra Heights, Selangor

Type of Work Required

Masonry (cement, concrete, tiles), Demolition (wall hacking), Flooring, Plumbing, Door or window, Glass work, Drywall Partition

Type of building

Condominium, Apartment

Do you already have these items? (Optional)

Key (for new property), Floor plan

When do you need site visit?

26/10/2026

Would you like our Project Consultant to help you get the best quotes and review your quotations?

No, I can manage my own renovation

Share as much details as you can for us to shortlist the most suitable renovation contractors for your job

Project Location: The Serenade, The Glades, Putra Heights (Condominium / High-Rise) Property Type: Type B Unit Project Title: Wet Kitchen Expansion, Utility Modification & Masonry/Electrical Works 1. PROJECT OVERVIEW We are seeking qualified contractors to execute structural wall hacking, new partition wall construction, wet kitchen expansion works, tile hacking/retiling, waterproofing, plumbing capping, and electrical extensions. All works must comply with management corporation (MC / JMB) guidelines for high-rise residential properties. 2. DETAILED SCOPE OF WORKS A. Demolition, Hacking & Removal 1. Toilet Removal: o Demolish non-structural partition walls surrounding the existing toilet to expand the Wet Kitchen area. o Dismantle and dispose of all existing sanitary fittings (WC, basin, tap fittings, shower set, doors). o Hack floor tiles and wall tiles cleanly down to the concrete slab/brickface. 2. Wet Kitchen Expansion Outward (900mm Reduction of Dry Kitchen): o Hack and remove the existing wet kitchen entrance wall to expand the wet kitchen footprint 900mm outward into the dry kitchen area (aligning flush with the corner of the protruding L-shape structure). o Construct a brand-new partition wall at this new 900mm extended boundary, incorporating a glass sliding door. 3. Utility Room Wall Opening (Facing Dining Room): o Hack/remove the far wall of the Utility Room facing the Dining Room to create an open-plan layout connecting the Utility Room directly to the Dining area. 4. Wet Kitchen & Reduced Dry Kitchen Wall Tile Hacking & Partition Infilling: o Wet Kitchen Area: Hack and remove all existing wall tiles throughout the original wet kitchen, former toilet zone, and the newly expanded wet kitchen footprint down to the brickface/concrete wall for full-height wall tile preparation. o Dry Kitchen Area (Reduced Footprint): Hack and remove the builder-installed wall tiles along the remaining dry kitchen wall down to the brickface/substrate, and render/level the wall surface to make it clean, plumb, and ready for full-height wall tiling. o Partition Wall Modification (Between Wet Kitchen & Utility Room): Remove existing door and window fixtures between the wet kitchen and utility room, and infill/brick up the vacant door and window voids using lightweight concrete/clay bricks with smooth plastering on both sides. B. Masonry, Flooring & Waterproofing 1. Floor Levelling & Step Relocation: o Level the floor slab across the expanded wet kitchen zone. o Relocate the existing wet kitchen floor step outward so that it matches and sits precisely at the new 900mm expanded wet kitchen boundary line. 2. Waterproofing: Apply 2 coats of heavy-duty waterproofing membrane (with upturn along wall perimeters) across the entire unified wet kitchen, former toilet, and expanded 900mm floor zone. Water ponding test required before tiling. 3. Wall & Floor Tiling (Wet & Dry Kitchens): o Wet Kitchen Floor: Supply and install non-slip floor tiles across the entire expanded wet kitchen area (including the relocated step). o Wet Kitchen Walls: Supply and install wall tiles full-height (floor-to-ceiling) across all exposed perimeter walls in the expanded wet kitchen area. o Dry Kitchen Walls: Supply and install wall tiles full-height (floor-to-ceiling / to the very top) along the prepared Dry Kitchen wall area. o Tile Selection & Supply Terms:  Contractor to present available tile samples/catalogs for owner review and selection.  Owner's Option to Self-Procure: The owner reserves the right to purchase/supply their own tiles directly if contractor-supplied options do not meet design preferences. Contractors must provide an itemized quote clearly separating Tile Material Costs from Tiling Labor, Screeding & Installation Material Costs (cement, adhesive, grout). C. Plumbing & Drainage Works 1. Soil Pipe & Water Supply Capping: o Safely cap off the main soil/toilet stack and branch lines below floor level with watertight, odor-proof seals. o Relocate/cap cold water supply lines previously feeding the toilet. D. Electrical & Power Distribution 1. General Lighting & Sockets: o Relocate existing light switches and power points affected by wall hacking and the 900mm wet kitchen boundary shift. 3. CONTRACTOR REQUIREMENTS & SUBMISSIONS • Management Approval: Contractor must handle permit applications, and adhere to policies set by The Glades Management Office. 4. QUOTATION SUBMISSION INSTRUCTIONS Please provide an itemized quotation breakdown for: 1. Demolition, Tile Hacking & Debris Disposal (including dry kitchen wall tile removal and wall preparation) 2. Brickwork, New Partition Wall Construction & Glass Sliding Door Installation (900mm wet kitchen expansion into dry kitchen) 3. Plumbing (Soil pipe capping) & Waterproofing (with mandatory ponding test over the expanded slab) 4. Masonry, Floor Step Relocation, Full-Height Tiling & Installation Labor (itemized separately for material vs. labor/mortar) 5. Electrical & Wiring Works (including single 13A socket addition in the former toilet area) Please include Available Start Date and work duration estimate in quote.

Rough Budget

RM10000 - 19999