Adeline

Double confirmed with contractor that the quotation includes materials. Already communicated to contractor that two bathroom tiles are broken and needed replacement and fixing. However, the contractor arrived without bringing the tiles as he thought we are the ones providing the tiles.
Also, he overcharged us for the additional bidet in the bathroom that needs replacing - RM80 for one bidet, unbelievable!

Shikin

The leaking due to the pipe, the contractor just changed the 1 head (that around 10++ to 30 RM,but it’s cost RM230 for the whole services

Han Chin

Good

Yow

all good

Noremma

Fast, quick, responsive

Pui Sann

Responsive, responsible, efficient

Effi

Very recommended. I booked slot at 10am but he arrived at 915am and the job done in 15 mins!

irfanshakeel

The very best

Tick Wah

5-star. I would recommend.

Shamsul

Responsive

Contact SQ(M)international

Request This Vendor